Projects

Work, evidence, and useful outputs.

Selected client work, research, and demonstration material is labelled by delivery and evidence status so visitors can see what MADESAI did without inflated claims.

Abstract flow from fragmented project evidence through validation and traceability to an implementation roadmap
Completed project

Independent ISO 19650 Pre-Assessment for an Engineering Consultancy

MADESAI reviewed ISO 19650 Part 2 documentation and representative project evidence for an engineering consultancy, validated the principal gaps, reconciled overlapping findings from an independently conducted mock audit, and converted them into corrective priorities and an implementation roadmap.

7 Oct 2026BIM & Digital Delivery
GIS site-selection concept showing layered spatial criteria, transport and amenity networks, and candidate coworking locations across Eindhoven.
Capability showcase

QGIS and OpenStreetMap Site Screening for Coworking Locations in Eindhoven

MADESAI presents a retrospective GIS study that used OpenStreetMap data and a QGIS graphical model to screen potential locations for coworking office spaces in Eindhoven.

8 Aug 2026GIS & Spatial Analysis
Conceptual illustration of 3D concrete printing adoption readiness, connecting construction technology with research, regulation, economics, skills, and stakeholder coordination.
Completed project

3D Concrete Printing Adoption-Readiness Framework for India

Madesai originated the adoption-readiness problem, formulated the CEPT University MSc DRP with BIMCrew, and supervised the three-month research through to a student-produced readiness and stakeholder-responsibility framework.

3 Aug 2026Materials & Industrialised Construction
Conceptual illustration of BIM-FM information continuity, showing fragmented construction data becoming structured building information for facility operations.
Completed project

Preserving BIM, COBie and Asset Information from Construction to Facility Management

Madesai originated the information-continuity problem, formulated the CEPT University MSc DRP with BIMCrew, and supervised the three-month research into why construction information loses meaning before FM use.

3 Aug 2026BIM & Digital Delivery
Conceptual DfMA workflow connecting coordinated digital design, off-site manufacturing, logistics, and on-site modular assembly.
Completed project

DfMA Adoption and Workflow-Transition Framework for Indian Construction

Madesai originated the DfMA transition problem, formulated the CEPT University MSc DRP with BIMCrew, and supervised the three-month research across industry evidence, workflow comparison, organisational readiness, and framework development.

3 Aug 2026Materials & Industrialised Construction
Conceptual illustration of a building information ecosystem connecting construction activities, asset data, project teams, servers, and facility operations.
Completed project

Nine-Stage BIM-to-FM Digital Handover Tool-Evaluation Framework

Madesai originated the construction-FM tool-selection problem, formulated the CEPT University MSc DRP with BIMCrew, and supervised the three-month research through practitioner evidence and a student-produced nine-stage evaluation method.

3 Aug 2026BIM & Digital Delivery
Technical infographic showing an industrial steel mezzanine surrounded by fire-risk assessment, material behaviour, stakeholder analysis, protection strategies, and technical guidance stages.
Completed project

Fire-Safety Research and Solution Development for Cold-Formed Steel Mezzanine Systems

An applied R&D project that translated fire-safety principles into a structured decision foundation for industrial mezzanine systems, covering fire scenarios, stakeholder objectives, protection strategies, evidence limitations, and future development priorities.

18 Jul 2026Fire Safety & Construction Systems
Technical infographic showing a steel mezzanine connected to supplier search, technical briefing, collaboration, system options, evidence collection, and applicability-review stages.
Completed project

European Fire-Protection Solution and Supplier Screening for Cold-Formed Steel Mezzanine Systems

A supplier-liaison project that searched for relevant manufacturers, translated mezzanine requirements into structured inquiries, coordinated technical discussions, gathered system evidence, and explored opportunities for collaborative solution development.

18 Jul 2026Fire Safety & Construction Systems
An EPANET-inspired hydraulic model showing color-coded pipes, junction nodes, reservoirs, and rural water-distribution branches
Completed project

EPANET Hydraulic Modelling and Structural Design for Rural Drinking-Water Networks in Rajasthan

This project developed and validated hydraulic models for rural drinking-water distribution, linking population forecasting, demand assessment, EPANET simulation, pipeline profiling, valve placement, metering, and thrust-block design

18 Jul 2026Infrastructure & Water
BIM-Enabled Asset Valuation and Circular Procurement Framework for Reusable Building Components
Completed project

BIM-Enabled Asset Valuation and Circular Procurement Framework for Reusable Building Components

MADESAI developed a circular procurement and asset valuation framework for second-use building components, linking BIM-enabled asset information, deconstruction planning, reuse potential, resource recovery, circularity indicators, and online material trading

1 Jun 2026Sustainability & Circularity
CSRD and ESRS Double-Materiality Methodology for a European Industrial Manufacturing Group
Completed project

CSRD and ESRS Double-Materiality Methodology for a European Industrial Manufacturing Group

MADESAI supported CSRD readiness and double materiality assessment preparation for a European industrial manufacturing group by structuring the DMA methodology, value-chain map, stakeholder engagement strategy, ESRS topic mapping, IRO long list, material topic prioritisation, internal handouts, and audit-readiness documentation.

1 Jun 2026Sustainability & Circularity

Start a conversation

Need a similar output?

Bring the challenge, the available material, and the decision your team is trying to make.