Projects

Completed project

Independent ISO 19650 Pre-Assessment for an Engineering Consultancy

MADESAI reviewed ISO 19650 Part 2 documentation and representative project evidence for an engineering consultancy, validated the principal gaps, reconciled overlapping findings from an independently conducted mock audit, and converted them into corrective priorities and an implementation roadmap.

Abstract flow from fragmented project evidence through validation and traceability to an implementation roadmap
Evidence was organised into a traceable assessment structure and translated into prioritised implementation actions. The visual uses synthetic content.

Tags

#ISO 19650#Information Management#BIM#Audit Readiness#Common Data Environment#Evidence Management#Governance#Implementation Roadmap

Context

An engineering consultancy needed a clear evidence-based view of its ISO 19650 Part 2 readiness and a practical route from identified gaps to controlled implementation. MADESAI reviewed organisational documentation and representative project evidence, tested the relationship between documented controls and actual practice, and structured the results for management action.

The challenge

MADESAI conducted the external pre-assessment and prepared its preliminary review before learning that the client had separately booked a mock audit, which had not been incorporated into the original work sequence. The review independently identified many of the same evidence and control themes later raised through the mock audit. The challenge therefore extended beyond identifying gaps: the overlapping findings had to be reconciled, validated against the available evidence and converted into one practical action path. The organisation already used BIM processes, project controls and shared information environments, but relevant evidence was distributed across policies, templates, project records and working practices. The work needed to distinguish the documented paper state from actual practice, then compare actual practice with the required target controls and prioritise corrective actions under a compressed timetable.

MADESAI's role

MADESAI developed and adapted an evidence-based review method around the changing assessment situation. The work combined role confirmation, evidence mapping, documented-versus-actual validation and prioritised corrective action, while expanding the review and closeout material needed to support management decisions. Key activities 1. Confirmed the organisational role, review scope, evidence rules and service boundaries. 2. Issued client-facing document checklists, questionnaires and submission guidance. 3. Mapped organisational controls and representative project evidence across the information-management lifecycle. 4. Compared the documented paper state with actual practice and actual practice with the target control state. 5. Used focused discussions and workshop validation to resolve ambiguity and confirm ownership. 6. Converted validated gaps into prioritised corrective actions, closure evidence and an implementation roadmap.

Outputs

  • Document receipt and scope controls
  • Client evidence checklist, questionnaire and submission guidance
  • Controls-based organisational and project evidence mapping
  • Paper-versus-real and real-versus-target gap analysis
  • Validation question log and workshop material
  • Prioritised corrective-action register with responsibilities and closure evidence
  • Management summary, implementation roadmap and findings readout

Practical value

The convergence between MADESAI’s independently prepared preliminary review and the later mock-audit themes provided additional confidence that the priority gaps were relevant, without representing certification-body endorsement of MADESAI’s work. The work replaced a document-volume exercise with a traceable decision process linking requirements, evidence, validation, ownership and closure. The resulting roadmap separated immediate evidence-control improvements from longer-term process changes and established a repeatable structure for future internal review.

Responsible boundary

MADESAI provided documentation-alignment methodology, evidence structuring, document and survey review, stakeholder validation, gap analysis, corrective-action planning and a findings readout. MADESAI did not provide: 1. Internal-audit execution 2. Certification representation or a certification-body decision 3. Site visits, model or clash validation, or software testing 4. Legal or contractual assurance 5. A guarantee of conformity or certification outcome This public case study uses a generalised client description and synthetic visuals. The accompanying report preserves the assessment findings, implementation actions, closure logic and blank working templates while presenting project scores as ranges and removing client and project identities, named participants, exact dates, source files and proprietary evidence.

Start a conversation

Discuss a similar challenge.

Bring the context, available evidence and decision that needs to move forward.